Skip to content Skip to sidebar Skip to footer

Most flooring failures are subfloor failures. The product usually gets the blame and rarely deserves it.

What’s included
  • Subfloor preparation, levelling and moisture testing
  • Engineered and solid wood
  • Laminate and luxury vinyl tile
  • Underlay and acoustic layers
  • Underfloor heating compatibility checks
  • Baseboard, beading and threshold trims
  • Lifting and disposing of old flooring
How the work runs

The subfloor is levelled and moisture-tested before anything is laid, and the flooring is left to acclimatise in the room it is going into. Skipping either is what causes cupping, gaps and lifting months later.

Where we do this

Flooring installation across Toronto, Scarborough, Mississauga, Brampton, Markham, Vaughan, Durham Region.

Request a quote

Hello
Renovation, extension, repair and everyday handyman work across Toronto and the Greater Toronto Area. One contractor for the whole list, and the quote in writing.
Office

40 King St W, 41st Floor
Toronto, ON M5H 3Y2

Get in Touch

Tell us what needs doing and you get a written quote before any work starts.

Request a quote
info@renosly.com

Renosly © 2026. All rights reserved.