Commercial floors fail at the preparation stage far more often than at the covering. Moisture in a slab, an uneven substrate or the wrong adhesive will lift a floor that was specified perfectly well.
What’s included
- Substrate survey and moisture testing
- Screeding, levelling and damp-proof membranes
- Contract carpet and carpet tiles
- Vinyl, safety flooring and welded seams
- LVT and engineered systems
- Barrier matting, thresholds and trims
How the work runs
The substrate is tested before anything is ordered, because the survey result can change the specification. Areas are handed over as they are completed so parts of the space come back into use while the rest is still being laid.
Where we do this
Commercial flooring across Toronto, Scarborough, Mississauga, Brampton, Markham, Vaughan, Durham Region.
