Skip to content Skip to sidebar Skip to footer

The first stage of every renovation and the one where the most avoidable damage gets done, usually to the parts of the building nobody intended to touch.

What’s included
  • Careful strip-out of kitchens, bathrooms and fitted furniture
  • Removing non-structural walls
  • Lifting old floor coverings
  • Safely capping and removing redundant pipework and wiring
  • Protecting floors, stairs and areas remaining in use
  • Dust control and containment
  • Sorting, removal and disposal of waste
How the work runs

Nothing structural is touched before it has been checked, and older properties are surveyed for asbestos before strip-out begins rather than after something has been broken up.

Where we do this

Interior demolition & strip-out across Toronto, Scarborough, Mississauga, Brampton, Markham, Vaughan, Durham Region.

Request a quote

Hello
Renovation, extension, repair and everyday handyman work across Toronto and the Greater Toronto Area. One contractor for the whole list, and the quote in writing.
Office

40 King St W, 41st Floor
Toronto, ON M5H 3Y2

Get in Touch

Tell us what needs doing and you get a written quote before any work starts.

Request a quote
info@renosly.com

Renosly © 2026. All rights reserved.