The first stage of every renovation and the one where the most avoidable damage gets done, usually to the parts of the building nobody intended to touch.
What’s included
- Careful strip-out of kitchens, bathrooms and fitted furniture
- Removing non-structural walls
- Lifting old floor coverings
- Safely capping and removing redundant pipework and wiring
- Protecting floors, stairs and areas remaining in use
- Dust control and containment
- Sorting, removal and disposal of waste
How the work runs
Nothing structural is touched before it has been checked, and older properties are surveyed for asbestos before strip-out begins rather than after something has been broken up.
Where we do this
Interior demolition & strip-out across Toronto, Scarborough, Mississauga, Brampton, Markham, Vaughan, Durham Region.
